Previous Page  32 / 35 Next Page
Information
Show Menu
Previous Page 32 / 35 Next Page
Page Background www.dlonline.de

· dasdental labor · LXII ·

5/2014

33

All or nothing

Function

Sintering

Finally, the zirconium frameworks are

sintered in a sintering furnace. It

should be noted that both systems are

compatible for sintering (Fig. 8). The

Ceramill Therm2 sintering furnace,

which is suitable for the Ceramill sys-

tem, is designed to operate the respec-

tive sinter parameters very precisely.

This involves both the temperature

rate up to the final temperature of the

sintering procedure and the related

times in the sintering cycle.

The sintering diagram clearly shows

the sequence of the entire sintering

process in the Therm2 (Fig. 9). It shows

the temperature rate up to the final

temperature of 1450°C: This tempera-

ture is held for two hours and lowered

using a controlled cooling phase to

900°C as well as the final cooling of the

furnace.

e

Fig. 5 Prepared frame-

works, immersed in the

colour solution for basic

staining

e

Fig. 6 Removal of the

bridges from the colour

solution after 10 seconds

e

Fig. 7 Preparation of the

sinter tray with the stained

and dried bridges

d

Fig. 8 Clear start

Therm 2 sintering

furnace

e

Fig. 2 Trimming of the connectors

e

Fig. 3 Thinning of the margins, light

polishing of the surface

e

Fig. 4 Removal of the grinding dust

from the surface and the inside

Fig. 5

Fig. 2

Fig. 3

Fig. 4

Fig. 6

Fig. 7

Fig. 8